Skip to content

2027 edition · 24 January to 6 February

Register
18th edition · Tangier → Lac Rose

The only African cross-country rally that finishes in Dakar

Three countries. 12 stages. Three landscapes. One finish line. From 24 January to 6 February 2027, the caravan sets off from Tangier and crosses Morocco, Mauritania and Senegal all the way to Lac Rose.

24.01 → 06.02

2027 dates

12 stages

Morocco · Mauritania · Senegal

Since 2009

18 editions

J–92

Until the start in Tangier

The spirit of African rally-raid

Born in the sand, still African

When the Dakar left Africa, Jean-Louis Schlesser created the Africa Eco Race so that the spirit of African rally-raid would live on — the same sand, the same demands on navigation, the same taste for controlled risk.

The route has evolved since then, but the promise remains the same: Tangier at the start, Dakar at the finish, and the desert in between.

2009

First edition

18th

2027 edition

14

Days of racing

2026 edition · Photo Alexis Blondel
2026 edition · Photo Alexis Blondel

2027 Route

Three countries, three landscapes, one finish

See the detailed route

Tangier → Dakar, stage by stage

24 January → 6 February 2027

TangerMeknèsErfoudM'HamidAssaLaâyouneDakhlaAghouinitTabrankoutTeverittMpalDakar

Indicative route — stage details will be published at the end of November.

Morocco
01

Tangier → Dakhla

Morocco

Finding the rhythm

A succession of varied terrain: fast tracks, technical sections and navigation. A demanding first part, right from the first kilometres.

Mauritania
02

Dakhla → Ouad Naga

Mauritania

Another dimension

Wide open spaces, dunes and long specials in the desert. A decisive second week: navigation, mechanical management and endurance.

Senegal
03

Saint-Louis → Lac Rose

Senegal

Savannah and Lac Rose

A third landscape, in the heart of the savannah and its baobabs, then “La Plage”, the final special before the closing podium at Lac Rose.

The detailed route, with distances and the specifics of the Modern Race and Historic categories, will be revealed after the reconnaissance, at the end of November.

2027 entries

Entries are open

Entry form, fees, provisional supplementary regulations and general terms: everything is available to prepare your start in Tangier.

Key dates

14 days of racing

  1. Administrative and technical checks

    Vehicle and paperwork checks before the start.

    Tangier
  2. Prologue on the municipal beach

    It sets the starting order for the first stage.

    23.01.2027
  3. Official start

    Tangier, heading south.

    24.01.2027
  4. Finish at Lac Rose

    Final podium on the shores of Lac Rose, Dakar.

    06.02.2027

Testimonials

They say it better than we do

I am glad that I was standing at the finish line of AER 22 in Dakar at the Pink Lake. It is the goal and dream of all racers who do cross-country races all over the world.

Team Barth Racing Competitor

You dream of dunes and beautiful landscapes, follow us to the Lac Rose !

René Metge Co-founder of the race

Africa is an happy continent with smiling people, with freedom for racing, thanks a lot to orga work to preserve classic African event based on values from first Dakars... Good luck AER!

Tomas Tomecek Winner Truck AER 2022
Baltic × Africa Eco Race

Official partner

Baltic × Africa Eco Race

The CAP 180°, designed with Baltic for the 2027 edition — the official watch for those who take the start in Tangier.

2027 edition · 18th edition

See you on 24 January in Tangier

Three countries, 12 stages, one finish line: Lac Rose.

92 days to the start 24 January 2027